如今環(huán)境下經(jīng)濟(jì)不斷的進(jìn)步,作為普通老百姓的我們可以從建筑外觀上也是可以看出來(lái)的。建筑工地的增加,人們的居住環(huán)境也有了很大的改善,大家在施工單位施工過(guò)程是需要提供人員的住宿休息問(wèn)題,大多數(shù)都會(huì)選擇彩鋼板進(jìn)行搭建彩鋼房。彩鋼房搭建在各個(gè)工地已經(jīng)很是普遍了。彩鋼是集生產(chǎn)、銷售、安裝彩色壓型板,保溫夾芯板、C、Z型鋼檁條,輕鋼結(jié)構(gòu)于一體的集團(tuán)化公司。公司擁有一批的工程師、設(shè)計(jì)師和熟練的技術(shù)隊(duì)伍,并擁有現(xiàn)代化的管理機(jī)構(gòu)。彩鋼廠。
With the continuous progress of the economy in today's environment, as ordinary people, we can also see it from the appearance of buildings. With the increase of construction sites, people's living environment has also greatly improved. During the construction process of construction units, it is necessary to provide accommodation and rest for personnel. Most people choose to build color steel houses with color steel plates. The construction of color steel houses is already common on various construction sites. Caigang is a group company that integrates the production, sales, and installation of colored profiled panels, insulation sandwich panels, C and Z-shaped steel purlins, and light steel structures. The company has a team of professional engineers, designers, and skilled technical personnel, as well as a modern management structure. Color steel factory.
下面就有彩鋼廠的小編來(lái)為大家總結(jié)一下有關(guān)鋼結(jié)構(gòu)常用的加固方法如下:
Below, the editor from Color Steel Factory will summarize the commonly used reinforcement methods for steel structures as follows:
《一》鋼結(jié)構(gòu)卸荷加固:適用于結(jié)構(gòu)損壞較大或構(gòu)件和連接的應(yīng)力狀態(tài)很高,需要暫時(shí)減輕其負(fù)荷時(shí)。對(duì)某些主要承受可動(dòng)荷載的結(jié)構(gòu)(如吊車梁等),可限制其可動(dòng)荷載,即相當(dāng)于大部分卸荷。
《1》 Steel structure unloading reinforcement: suitable for structures with significant damage or when the stress state of components and connections is high and it is necessary to temporarily reduce their load. For certain structures that mainly bear movable loads, such as crane beams, their movable loads can be limited, which is equivalent to most unloading.
《二》鋼結(jié)構(gòu)預(yù)應(yīng)力拉索法:利用高強(qiáng)拉索加固結(jié)構(gòu)薄弱環(huán)節(jié)或提高結(jié)構(gòu)整體承載力、剛度和穩(wěn)度。
《2》 Steel structure prestressed cable method: using high-strength cables to strengthen weak links in the structure or improve the overall bearing capacity, stiffness, and stability of the structure.
《三》鋼結(jié)構(gòu)改變計(jì)算簡(jiǎn)圖:增設(shè)附加支承,調(diào)整荷載分布情況,降低內(nèi)力水平,對(duì)超靜定結(jié)構(gòu)支座進(jìn)行強(qiáng)迫位移,降低應(yīng)力峰值。
《3》 Simplified calculation diagram for steel structure changes: adding additional supports, adjusting load distribution, reducing internal force levels, forcing displacement of bearings for statically indeterminate structures, and reducing stress peaks.
《四》鋼結(jié)構(gòu)帶負(fù)荷加固:是用于構(gòu)件(或連接)的應(yīng)力小于鋼材設(shè)計(jì)強(qiáng)度的80%時(shí),或構(gòu)件無(wú)甚大損壞(破損、變形、翹曲等)的情況下。此時(shí)為了使新加固桿件參與受力,有時(shí)需要對(duì)被加固桿件采取臨時(shí)卸荷的措施。另外,在加固時(shí)應(yīng)注意不影響其他構(gòu)件的正常使用。
《4》 Steel structure load reinforcement: It is used when the stress of the component (or connection) is less than 80% of the design strength of the steel, or when the component is not significantly damaged (damaged, deformed, warped, etc.). At this time, in order to allow the newly reinforced members to participate in the force, it is sometimes necessary to take temporary unloading measures on the reinforced members. In addition, attention should be paid to not affecting the normal use of other components during reinforcement.
《五》鋼結(jié)構(gòu)截面補(bǔ)強(qiáng)法:在局部或沿構(gòu)件全長(zhǎng)以鋼材補(bǔ)強(qiáng),連成整體使之共同受力。
《5》 Steel structure section reinforcement method: Steel reinforcement is used locally or along the entire length of the component, connecting it into a whole to jointly bear the force.
《六》鋼結(jié)構(gòu)從原結(jié)構(gòu)上拆下應(yīng)加固或更新的部件:當(dāng)結(jié)構(gòu)破壞嚴(yán)重或原截面承載力過(guò)小,必須在地面進(jìn)行加固或更新時(shí)采用。此時(shí)必須設(shè)置臨時(shí)支撐,使被換構(gòu)件完全卸荷;同時(shí),必須保證被換結(jié)構(gòu)卸下后整個(gè)結(jié)構(gòu)的。
《6》 Steel structures that need to be reinforced or updated when removed from the original structure: When the structure is severely damaged or the bearing capacity of the original section is too small, it must be reinforced or updated on the ground. At this time, temporary support must be set up to completely unload the replaced component; At the same time, it is necessary to ensure the safety of the entire structure after the replacement structure is removed.
本文由禹城鋼結(jié)構(gòu)板房友情奉獻(xiàn).更多有關(guān)的知識(shí)請(qǐng)擊:http://m.hxwjw.org.cn我們將用真誠(chéng)的態(tài)度.為您提供為的服務(wù).更多有關(guān)的知識(shí)我們將會(huì)陸續(xù)向大家奉獻(xiàn).敬請(qǐng)期待.
This article is dedicated by Yucheng Steel Structure Board House. For more related knowledge, please click: http://m.hxwjw.org.cn We will provide you with comprehensive service with a sincere attitude. We will gradually contribute more relevant knowledge to everyone. Stay tuned